Business Interruption Recovery for North Wales Manufacturer
The Client
Manufacturing Plant
The Outcome
Full Operational Continuity Achieved

Case Overview
Navigating complex business interruption claims following a significant flood event at a production facility.
The Challenge
A high-precision manufacturing plant in North Wales was forced to cease operations after a flash flood. We managed both the material damage claim and the highly complex business interruption loss, ensuring the company could retain its staff throughout the recovery period.
Our Approach
Our structural specialists and loss assessors conducted a comprehensive site investigation to document all visible and latent damage. We then cross-referenced these findings with the client's insurance policy to identify often-overlooked coverage clauses that applied to their specific situation.
Final Results
By acting as a buffer between the policyholder and the insurer's loss adjuster, we ensured that the technical evidence was presented clearly and formidably. This led to a full and fair settlement that completely covered the restoration costs.
The Outcome
Following our intervention, the client received the full funding necessary to appoint their preferred contractors. The property was restored to its original condition (or better) without any out-of-pocket expenses beyond their standard policy excess.

